The Little Maumelle Treatment Facility and related construction projects are well underway. Read below to learn more.
|
Contract III: Pump Station
|
|
Summary of Work Performed this week: 09/12/2009
|
Carson & Associates, Inc.: General Contractor
Carson & Associates oversaw work listed below and performed minor site cleanup. |
Harvill Byrd: Subcontractor
Harvill Byrd continued fabrication of the onsite electrical to the 24-inch Electric Actuated Plug Valve and prepared for pulling wires Bar Screen/Conveyor Control Panel. HB placed electrical stub-ups for the Bar Screen/Conveyor Control Panel and for the SCADA. |
Howell Utility: Subcontractor
Howell Utility worked in coordination with JCS Concrete Specialists for removing forms from the HVAC sidewalk, trash bin equipment slab, and Metering Station equipment slab. Howell Utility completed compacting SB2 for the Pig Station. GHBW was onsite for testing. All tests passed within specifications. HU tested the remaining 8-inch, 18-inch, and 24-inch line, to just north about 10-feet of the existing flow meter manhole. All tests passed within specifications. HU excavated and compacted SB2 for the both Overhead Crain footings. |
Rain For Rent: Subcontractor
On Wednesday, Rain for Rent was onsite for observation of the Bypass system. |
Edwards Metal Inc.: Subcontractor
Edwards Metal, Inc. unloaded materials and prepared for placement of the HVAC ductwork. |
JCS Concrete Specialists: Subcontractor
JCS Concrete Specialists performed minor cleanup and removed forms from the HVAC sidewalk, trash bin equipment slab, and Metering Station equipment slab. JCS Concrete Specialists prepared for placement of the rebar and formwork for Pig Station equipment slab. |
Other Notes: The Monthly Meeting was held at LMPS Engineering Trailer at 10:00 a.m. on
September 09, 2009. |
|