The Little Maumelle Treatment Facility and related construction projects are well underway. Read below to learn more.
|
County Farm Rd. Waterline Relocation Project
|
|
Summary of Work Performed this week: 09/12/2009
|
The jobsite was shut down Wednesday due to the weather, but a few guys were there just to receive materials. Larry Place (CDM) is in the process of asking Gary (Max Foote Construction) to go down to the site to seal off the storm water inlets.
S&J Construction received a load of 8-inch DIP for the CAW line relocation. The contractor located the existing 8” waterline on the East end of Co. Farm Road near the entrance of Two Rivers Park on the North side of the road. A tap was made into the existing 8” waterline that feeds the residents in this area. A valve was installed for the purpose of keeping flow off of the new line during construction at this tap. The crew will begin laying new pipe at this point heading west. |
|